Architectural DesignLandscape DesignInterior DesignEvacuation Plans3D RenderingRenovationArchitect in BodrumProjectsJournalAboutContact
0507 515 35 15WhatsAppTürkçe
Guide

Choosing an architect in Bodrum: 10 questions to ask

When comparing quotes, look at scope and responsibility, not just the price.

Message us on WhatsAppCall: +90 507 515 35 15

Getting quotes from several studios for a villa, garden or interior project in Bodrum is a sensible approach. But the quotes rarely cover the same work. The questions below help you compare them on equal terms.

  1. Registration and licenceCan their membership of the Chamber of Architects and their right to practise be verified? Who signs the project?
  2. Contract scopeDoes the quote cover only the preliminary design, or also the permit and construction drawings? Is site supervision included?
  3. Permit responsibilityWho handles the municipality and, where needed, the board? If documents are missing, who completes them?
  4. Experience with similar plotsHave they worked on sloping, seaside or protected plots? Can they show images of real projects?
  5. Zoning analysisWill the zoning status and plan notes be reviewed before design begins?
  6. Fit with the climate and local buildingIs the design shaped by Bodrum's wind, sun and dry climate? Are landscape and interiors considered at the same time?
  7. Revisions and scheduleHow many revisions are included? Are the stages and delivery dates in writing?
  8. How fees workHow is the fee calculated? How will extra work be priced?
  9. CommunicationWho will you deal with throughout? How quickly do they reply?
  10. Site follow-upWill someone visit and check the work on site during construction?

This guide doesn't compare our studio with others; it lists criteria you can use with any studio. You can ask Kilta the same questions: About us.

Read next

Related guides

Frequently asked questions

How do I check that an architect is registered?

Membership of the Chamber of Architects and the right to practise can be confirmed with the chamber. Signing projects and taking responsibility for them depend on this registration.

What should the contract say?

The scope of the service (concept, permit, construction drawings, site supervision), the delivery stages, the number of revisions, the payment plan, and who is responsible for any extra documents needed for the permit should all be in writing.

Is choosing the cheapest quote a good idea?

Quotes need to be compared on the same scope. A quote that leaves out the permit or site follow-up looks cheaper but can lead to extra costs later.

Tell us about your plot and plans

The first consultation is free. Just send us a WhatsApp message.

Message us on WhatsApp