Architectural DesignLandscape DesignInterior DesignEvacuation Plans3D RenderingRenovationArchitect in BodrumProjectsJournalAboutContact
0507 515 35 15WhatsAppTürkçe
Bodrum

Architect in Bodrum

From the plot's zoning status to the building permit, from construction drawings to site supervision, all from one office. See the area guides below for information on your location.

Message us on WhatsAppCall: +90 507 515 35 15
Process

Steps to building in Bodrum

Every plot is different, but the order is usually the same. The steps below are a general framework; the specifics for your plot become clear after a site visit and a look at the documents.

  1. Zoning status and plan notesThe zoning certificate (imar durumu) and plan notes from the municipality are reviewed, and the land type on the title deed (building plot or field) is checked. How to check
  2. Checking restrictionsProtected-area, conservation, coastal and forest restrictions are researched. The Coastal Law and Conservation Board approval matter at this stage.
  3. Concept and preliminary designThe concept is shaped by the plot, the view and your brief. The design process
  4. Permit drawings and approvalThe project is submitted to the municipality (and the board, where required). Building permit guide
  5. Construction drawings and siteDetail drawings are prepared and the build is supervised on site. Site management
Areas

Guides by area

We work across the whole of Bodrum: Bodrum Centre, Gümbet, Bitez, Ortakent, Yahşi, Akyarlar, Turgutreis, Gümüşlük, Yalıkavak, Gündoğan, Türkbükü, Göltürkbükü, Gölköy, Torba, Yalıçiftlik, Konacık, Karaincir, Kızılağaç, Mumcular, Geriş, Güvercinlik and Çiftlik. We have written separate guides for the areas below. They give general information; the plot's own documents always decide.

Services

What does Kilta do?

Frequently asked questions

What is the first step to building a villa in Bodrum?

Getting the plot's zoning certificate and plan notes. Restrictions such as protected-area, coastal or agricultural status become clear at this stage.

Can you build a house on agricultural land?

Building on agricultural land is limited by Law No. 5403 and its regulation; vineyard houses and hobby gardens require a minimum plot size and other conditions: Building on agricultural land in Turkey.

How long does the permit process take?

It depends on the plot's status, how complete the file is and how busy the municipality is, so we don't promise a fixed time. The steps: The villa permit process in Bodrum.

What do I need to rent out my villa?

Short-term rentals may need a licence: Tourism licence guide.

Do you work with foreign clients?

Yes. We work in Turkish and English. Drawings and progress updates can be shared online, and we can meet on site when you are in Bodrum.

Tell us about your plot and plans

The first consultation is free. Just send us a WhatsApp message.

Message us on WhatsApp